On the Job with Knobelsdorff Electric: Contractor Maximizes Efficiency with Wire Pulling Solutions

Pulling heavy medium voltage cable over long distances can be tiring and time consuming. What if you could cut installation time in half with less manpower? Go On the Job with Knobelsdorff Electric to see how they were able to execute a more efficient wire pull by partnering with Van Meter.

CHALLENGE: PULLING HEAVY MEDIUM VOLTAGE CABLE

Knobelsdorff reached out to Van Meter about procuring medium voltage cable for a project, but what started as a routine quote request for material turned into a discovery of how using the right equipment can save time and effort when pulling wire.

Knobelsdorff was tasked with refeeding a transformer with 500 MCM medium voltage cable from the utility. The job took nearly 1,000 feet of the 500 MCM cable. Normally, pulling 1,000 feet of such a large cable would require a lot of people, time and effort, but Van Meter partnered with Knobelsdorff to provide Southwire tools, pre-planning and jobsite services that significantly reduced their pulling effort and installation time.

pulling wire off truck

SOLUTION: AN ALL-ENCOMPASSING APPROACH TO WIRE PULLING

Van Meter helped Knobelsdorff pull the medium voltage wire more efficiently in a couple ways. First, Van Meter introduced them to time-saving Southwire tools like these:

Learn how one person can set up a heavy-duty overhead wire pull in minutes
Learn more »

Learn how to maximize your Southwire XD1 Wire Puller
Learn more »

Watch this video tutorial on how to make an eye splice to create a new wire pulling eye
Learn more »

Maximize the capability of your wire pull ropes with Southwire QWIKrope soft shackles
Learn more »

How to kit the best rope for pulling wire through conduit
Learn more »

Comparing cable grip options for pulling wire through conduit
Learn more »

While wire pulling tools are helpful, using certain components without a full solution can do more harm than good. More than parts, Van Meter partnered with Knobelsdorff to bring a full solution together with pre-planning and jobsite services that allowed them to hit the ground running when they got to site.

For example, rather than having to unload and transport three heavy A-Frame reels of wire, Knobelsdorff was able to pull the wire from Van Meter’s truck, which was pulling a large flatbed, directly into the termination cabinet.

xd10 wire pull

RESULT: A SIMPLER, MORE EFFICIENT WIRE PULL

How much time did they save? Van Meter’s wire and cable solutions can decrease installation time by 50% with 33% less manpower. With factory installed pulling heads, the wire ready to pull from the truck and the XD10 wire tugger, which doesn’t need to be bolted down, Knobelsdorff was able to start pulling wire as soon as the wire arrived on site. What could have been a four-to-six-hour project took less than two hours to complete.

xd1 handheld wire pull

DISCOVER MORE EFFICIENT WIRE PULLING SOLUTIONS

Are you looking for ways to reduce installation and manpower on your jobsite? How can pre-planning, jobsite services and Southwire tools and equipment help you stay on time and under budget? Schedule a hands-on training session at one of our wire innovation centers to try Southwire tools and equipment for yourself. Wall-to-wall wire innovation awaits you!